Home > Projects
ALDI DISTRIBUTION WAREHOUSE
Client: Metro SteelDuration: 2015Tonnage: 800t
READ MORE
Large roof trusses and columns to support a huge roof for the Aldi Distribution centre in Jandakot, Perth.
ALDI DISTRIBUTION WAREHOUSE
Client: Metro SteelDuration: 2015Tonnage: 800tLarge roof trusses and columns to support a huge roof for the Aldi Distribution centre in Jandakot, Perth.
CIVMEC PAINT SHED
Client: CivmecDuration: Nov 2013 - Mar 2014Tonnage: 500 Tonnes
READ MORE
Steelwork for a paint shed near the coat in Henderson, Perth WA. All of the columns were 15m..
CIVMEC PAINT SHED
Client: CivmecDuration: Nov 2013 - Mar 2014Tonnage: 500 TonnesSteelwork for a paint shed near the coast in Henderson, Perth WA. All of the columns were 15 metres long and were double dipped.
FMG NELSON POINT
Client: Fremantle Steel FabricationDuration: Mar 2011 - July 2012Tonnage: 2800 Tonnes
READ MORE
The FMG Nelson Point port expansion started as 1000 tonnes but is forcast to reach 5000 tonnes of…
FMG NELSON POINT
Client: Fremantle Steel FabricationDuration: Mar 2011 - July 2012Tonnage: 2800 TonnesThe FMG Nelson Point port expansion started as 1000 tonnes but expanded to 2800 tonnes of galvanized steel when finished. All steelwork was galvanized, inspected, marked, packed and despatched direct from our Naval Base factory.
DAMPIER INCREMENTAL
Client: Pacific Industrial CompanyDuration: Sep 2011 - May 2012Tonnage: Approx 1000 Tonnes
READ MORE
The highlight of this project was the galvanizing of twelve fifteen metre columns weighing over ten tonnes each….
DAMPIER INCREMENTAL
Client: Pacific Industrial CompanyDuration: Sep 2011 - May 2012Tonnage: Approx 1000 TonnesThe highlight of this project was the galvanizing of twelve-fifteen metre columns weighing over ten tonnes each. This required the help of Matt Clarke and his team at The Lifting Company who designed and fabricated a specialised lifting system using three mobile cranes, a spreader bar and chains capable of withstanding the tough galvanizing conditions. Each column took two hours just to galvanize and are the heaviest pieces of steel ever galvanized by Hartway Galvanizers. Pacific Industrial Company has taken advantage of the individual project areas set up on-site with all steelwork being galvanized, inspected, barcoded, packed and despatched direct from the Naval Base factory.
BHP RGP3 & 4
Client: MonadelphousDuration: 2006 - 2007Tonnage: 1,700 Tonnes
READ MORE
Another expansion by BHP to its Port Loading & Stockpiling facilities. All steelwork was galvanized, identified, labelled, packed…
BHP RGP3 & 4
Client: MonadelphousDuration: 2006 - 2007Tonnage: 1,700 TonnesAnother expansion by BHP to its Port Loading & Stockpiling facilities. All steelwork was galvanized, identified, labelled, packed and loaded onto trucks from Hartway Galvanizers yard.
FIONA STANLEY HOSPITAL
Client: Pacific Industrial CompanyDuration: Feb - Mar 2011Tonnage: 400 Tonnes
READ MORE
Steel work for the plant room of this massive hospital. Due to limited space on site the steel…
FIONA STANLEY HOSPITAL
Client: Pacific Industrial CompanyDuration: Feb - Mar 2011Tonnage: 400 TonnesSteel work for the plant room of this massive hospital. Due to limited space on site the steel was packed into cradles in specific order to cut double handling and enable quick erection of each level.
RTIO DAMPIER PORT UPGRADE
Client: MonadelphousDuration: Feb 2006 - Sep 2007Tonnage: 1,913 Tonnes
READ MORE
New Rail Car Dumpers, Transfer Stations & Conveyor Systems as Rio Tinto expanded its facilities. All steelwork was…
RTIO DAMPIER PORT UPGRADE
Client: MonadelphousDuration: Feb 2006 - Sep 2007Tonnage: 1,913 TonnesNew Rail Car Dumpers, Transfer Stations & Conveyor Systems as Rio Tinto expanded its facilities. All steelwork was galvanized, identified, labelled, packed and loaded onto trucks from Hartway Galvanizers yard.
QUARRY TAVERN
Client: H'VarDuration: Jun 2011Tonnage: 20 Tonnes
READ MORE
Hartway Galvanizers expertise was used to galvanize the exposed roof frame sections. These sections were varying shapes and…
QUARRY TAVERN
Client: H'VarDuration: Jun 2011Tonnage: 20 TonnesHartway Galvanizers expertise was used to galvanize the exposed roof frame sections. These sections were varying shapes and sizes and needed a high quality finish.
DERBY PRISON
Client: Wheeler Contracting & H'VarDuration: December 2010 - March 2011Tonnage: 600 Tonne
READ MORE
The prison perimeter fence and framework were all hot dip galvanized.
DERBY PRISON
Client: Wheeler Contracting & H'VarDuration: December 2010 - March 2011Tonnage: 600 TonneThe prison perimeter fence and framework were all hot dip galvanized.
ALLTYPE ENGINEERING
Client: Alltype EngineeringDuration: November 2010 - January 2011Tonnage: 250 Tonnes
READ MORE
All steelwork for their new workshop in Naval Base was hot dip galvanized for maximum protection due to…
ALLTYPE ENGINEERING
Client: Alltype EngineeringDuration: November 2010 - January 2011Tonnage: 250 TonnesAll steelwork for their new workshop in Naval Base was hot dip galvanized for maximum protection due to its close proximity to the ocean
HARVEY TANK
Client: H'Var Steel ServicesDuration: February 2011 - March 2011Tonnage: 75 Tonnes
READ MORE
All support and roofing steelwork for a 32ML concrete water storage tank at Harvey as part of the…
HARVEY TANK
Client: H'Var Steel ServicesDuration: February 2011 - March 2011Tonnage: 75 TonnesAll support and roofing steelwork for a 32ML concrete water storage tank at Harvey as part of the new Binningup Desalination Plant.
BP G10 DIESEL IMPROVEMENT
Client: Fremantle SteelDuration: October - December 2010Tonnage: 91 Tonnes
READ MORE
All steelwork was galvanized, laid out, inspected, bar coded, packed and loaded out direct from our Naval Base…
BP G10 DIESEL IMPROVEMENT
Client: Fremantle SteelDuration: October - December 2010Tonnage: 91 TonnesAll steelwork was galvanized, laid out, inspected, bar coded, packed and loaded out direct from our Naval Base factory.
CAPE LAMBERT MESA A POWER
Client: Future EngineeringDuration: February 2009 - September 2009Tonnage: 570 Tonnes
READ MORE
Power poles ranging in length from 16 to 21 metres were galvanized and despatched at our Naval Base…
CAPE LAMBERT MESA A POWER
Client: Future EngineeringDuration: February 2009 - September 2009Tonnage: 570 TonnesPower poles ranging in length from 16 to 21 metres were galvanized and despatched at our Naval Base factory.
ALCOA PINJARRA
Client: Pacific Industrial CompanyDuration: November 2004 - December 2005Tonnage: Over 2000 tonnes
READ MORE
After galvanizing all steelwork was identified, barcoded, loaded into cradles, then onto trucks and despatched to site from…
ALCOA PINJARRA
Client: Pacific Industrial CompanyDuration: November 2004 - December 2005Tonnage: Over 2000 tonnesAfter galvanizing all steelwork was identified, barcoded, loaded into cradles, then onto trucks and despatched to site from Hartway Galvanizers.
FMG CLOUDBREAK
Client: SDRDuration: July 2008 - October 2008Tonnage: 875 Tonnes
READ MORE
Starting at an estimated 300 tonnes for galvanizing, this quickly jumped up once the Project Managers for FMG…
FMG CLOUDBREAK
Client: SDRDuration: July 2008 - October 2008Tonnage: 875 TonnesStarting at an estimated 300 tonnes for galvanizing, this quickly jumped up once the Project Managers for FMG realised how much quicker the steelwork was on site and erected by using hot dip galvanizing.
Again, all steelwork was identified, barcoded, packed into cradles and despatched to site direct from Hartway Galvanizers by our staff.
BURRUP FERTILIZER PLANT
Client: Pacific Industrial CompanyDuration: February 2004 - November 2004Tonnage: Over 2000 tonnes
READ MORE
This was the first project of this size undertaken by Hartway Galvanizers. Some 140 truckloads of steel; most…
BURRUP FERTILIZER PLANT
Client: Pacific Industrial CompanyDuration: February 2004 - November 2004Tonnage: Over 2000 tonnesThis was the first project of this size undertaken by Hartway Galvanizers. Some 140 truckloads of steel; most in cradles were loaded and despatched to site from Hartway’s yard after galvanizing. The heaviest item galvanized was 6.09 tonne and the longest item 18.447 metres.
AUSTRALIAN MARINE COMPLEX
Client: Pacific Industrial CompanyDuration: January 2003 - February 2003Tonnage: 300 Tonne
READ MORE
A massive portable workshop built only 200 metres from the water. All external steelwork was galvanized.
AUSTRALIAN MARINE COMPLEX
Client: Pacific Industrial CompanyDuration: January 2003 - February 2003Tonnage: 300 TonneA massive portable workshop built only 200 metres from the water. All external steelwork was galvanized.
COLLIE STREET CARPARK
Client: FabriconDuration: October 2002 - January 2003Tonnage: 212 Tonne
READ MORE
Located in the harbour city of Fremantle; all steelwork for this project was galvanized and painted to withstand…
COLLIE STREET CARPARK
Client: FabriconDuration: October 2002 - January 2003Tonnage: 212 TonneLocated in the harbour city of Fremantle; all steelwork for this project was galvanized and painted to withstand the harsh coastal environment and give the longest possible lifespan